Detail 3


Now the footings have been poured and the gravel is being spread. The red dirt, thinly disguised with a scattering of gravel, quickly turned to sticky slop.
Steve roughed in plumbing for a sink. Luckily, we got one of those from friends KC and Mike too, so we're all set.
The south wall - the smaller, 10' garage door is going in this wall opposite the larger door.

Still some gravel to spread in this corner.

With luck, if we ever get around to it, I'll get a round pen on the other side of the pad, in front of the horse trailer.
North wall.

[BACK]