![]() |
The lumber has arrived and the slab is poured. Yay! |
![]() |
South wall. |
![]() |
Unfortunately, we were a little late for the slab signing. We didn't get home until late, by which time it was mostly set. But I sat out there in the dark with a torch and a scratchy thing and scraped on our names and the date. I hope it's deep enough. |
![]() |
West wall. |
![]() |
North wall. |
![]() |
Lumber pile. Everything except the roof trusses.
[BACK] |